Main Content Main Menu

Application

Construction Cases

Ulsan, Changwon Industrial Complex in Korea (2022)

관리자 2024-02-22 Number of views 132

Ulsan, Changwon Industrial Complex


Installed inside the underground hydrogen pipeline management manhole to monitor hydrogen leakage and the condition inside the manhole.

Pilot construction of manhole remote monitoring system (2022)


                                                                                                               • Proximity Sensor, Hydrogen Gas Sensor, Water Level Sensor

                                                                                                               • LoRa Gateway, Network Server, Platform Integration

                                                                                                               • Dedicated bracket for Underground Pipe in Manhole

                                                                                                               • Construction completed (November 2022)



[Ulsan and Changwon industrial complex manhole remote monitoring system installation, 2022]